Open Apple Maps to view the exact location of the project>>
Registration period: October 18, 2024 (Friday) to November 6, 2024 (Wednesday)
Bidding period: November 19 (Tuesday) to November 26 (Tuesday), 2024

To participate in the bidding, you must complete the application procedures within the application period.

Sale of public property (First Release)

Price Information

Booking price
29,440,000 yen
Bid security
2,944,000 yen

Schedule

Application Processing Time
October 18, 2024 13:00 ~ November 6, 2024 14:00
Bidding period
November 19, 2024 13:00 ~ November 26, 2024 13:00
Payment period of sale price
April 30, 2025 17:00
Contract signing period
December 6, 2024 17:00

Payment Methods

Bid security payment method
Bank transfer, etc.
Payment method of sale price
Bank transfer
Auction Type
Sale of public property
Implementation
Bidding Form
Name of executive agency
Asahi City
Selling Zone Number
Asahi Land 2024-2
Payment Methods
Bank transfer
Contract signing period
December 6, 2024 17:00

Object Information

Object Type
Other land
Location of the object
Chiba Prefecture

Basic real estate information

Register shows
Location: Asahi City, Nigyokuji, Kashiwaba

Land number 2098 No. 1 Dimu mountain forest cadastral 2,738m
2

Land No. 2110, mountain forest cadastral area 2,778m
2

Land number 2111, mountain forest cadastral 756m
2

Land number 2112, mountain forest cadastral area 672m
2
location
Chiba Prefecture Asahi City Ninyu Aza Kashiwaba 2098 No. 1, Ninyu Aza Oiwase Valley 2110 No. 2111 No. 2112
Transportation, nearest station, etc.
About 3km southeast of Kanigata Station on the JR Sobu Main Line

About 100m north of Asahi City Community Bus Niyugaoka Stop
status quo
・The local 4 plots are land used as a baseball field and sports park.

・Generally flat, the land has been leveled. The north side is connected to the road and used as an asphalt parking lot, and the baseball field is separated by a fence about 1.7 meters high. The east side is separated from the adjacent land by a ball-proof net. The west side is separated by a fence and hedge-like trees. The south side is in a strip shape and is about 0.5 meters higher.

・There are about 40 cherry trees planted around the baseball field.

・Water pipes are already laid on the road ahead and can be connected.

・Propane gas installation is required.

・The sewers have not been repaired.

・There are no offensive facilities etc., but there is a steel mill factory on the adjacent land on the east side.

・According to the testimony of nearby residents, there were pig farming facilities on part of the site at an unknown time. In addition, excavation was carried out in the early Showa period to mine iron sand, but the time and scale of the excavation are unknown.
illustrate
Please be sure to confirm the Asahi City Internet Public Property Sale Guide https://www.city.asahi.lg.jp/uploaded/attachment/16337.pdf and read it carefully before bidding.

About this application

After applying on the Internet (preliminary application), you will need to submit the official application form by mail or in person in order to make the official application.

For more information, please visit the Asahi City homepage (Internet Public Property Sale Process (Real Estate)) https://www.city.asahi.lg.jp/soshiki/2/14423.html.

About contract signing

・Since the project price for this project exceeds 20 million yen and the area exceeds 5,000m
2of land, and therefore a resolution of Parliament was required.

・After winning the bid, the winning bidder and Asahi City will sign a provisional contract within 7 days from the date of the winning bid, excluding weekends and holidays. After that, the contract will take effect after the parliament scheduled to be held in March 2020 obtains a resolution.

・One income stamp (depending on the contract amount) affixed to the contract is borne by the purchaser.

・Before signing the contract, you need to pay a contract deposit (10/100 of the contract amount or more). (The bid deposit will be used as the contract deposit and the contract deposit will be used as the sales price through the "Contract Deposit Request and Sales Price Request" submitted by the successful bidder.)

・In order to obtain parliamentary approval, the name and address of the successful bidder will be made public.

Land Information

Land area (㎡)
6944 (Registration Book)
Land rights
ownership
Land share
1/1
Land
Forest
Urban planning area
Non-linear urban planning area
Use area
No designation
Construction coverage rate (%)
60
Floor area ratio (%)
200
Japanese Shadow Regulations
There are sun shadow regulations (buildings over 10m in height)
Other laws and regulations
Road diagonal restrictions and adjacent land diagonal restrictions

Building Standards Act Article 22 Area

Land Law(5,000m
2)

※Please refer to the attached PDF document for more details.
Terrain, etc.
・The local area is flat land.

・Since it is the site of a former baseball field, weeds and trees are growing around it.

※Please refer to the attached PDF document for more details.
Width, connecting road conditions
・The north side is adjacent to a paved road about 4.5m wide.

・The south side is adjacent to an unpaved non-legal road.

※Please refer to the attached PDF document for more details.
Supply processing facilities
・A water pipe with a tap diameter of 20mm has been introduced.

・The sewers have not been repaired.

※Please refer to the attached PDF document for more details.
Other land-related property information
Public property will be delivered as is. Please participate after fully understanding the following matters.

・Please check the current situation and relevant official records in advance.

・The city is not responsible even if there are hidden defects (kashi) in public property.

・No specialized surveys were conducted on radiation, soil surveys, geological surveys, etc.

・If the drawings and other written matters are different from the current situation, the current situation shall prevail regardless of whether there are any written matters.

・For land development, etc. (including construction), in addition to the above, there may be restrictions and guidance from related laws and regulations. Please confirm the details with the relevant authorities.

Contact information for property-related inquiries

Producing administrative agency
Asahi City Government
Responsible Department
Administrative Reform Promotion Division Asset Management Division
email address
shisankeiei@city.asahi.lg.jp
Telephone
0479-62-5366
Processing time
9:00 a.m. - 5:00 p.m.
Last modified: October 17, 2024